Projects

Back

Facility Development Division

Customer

 

 

Name

 

 

Year

 

 

OTF Fővállalkozó Zrt.

 

 

Building and commissioning of compressor station and junction in Városföld and Báta relating to all divisions, with installation of Báta (three SOLAR Taurus 70 units), Városföld (three SOLAR Taurus 70 units).

 

2010

 

 

OTF Fövállalkozó Zrt.

 

 

Complete building and commissioning for all divisions of Beregdaróc compressor station (3x11MW) and junction and Hajdúszoboszló compressor station (2x8.5MW) and junction, in connection with the building of gas transmission pipeline for MOL Földgázszállító zRt.

 

 

2009

 

 

OTF Fővállalkozó Zrt.

 

 

Szőreg-1 safety underground gas storage -SZBT-1 compressor plant technological engineering, compressor plant pipe bridge technological engineering, auxiliary plant systems inside the compressor plant design limits. Instrument fitting, pressure tests, professional works. Assembly and installation of compressors and drive engines and directly connected equipment

 

 

2009

 

 

FGSZ Földgázszállító Zrt.

 

 

K104 unit (General Electric FRAME-3) renewal after 70,000 operating hours at Beregdaróc compressor station

 

 

2008

 

 

MOL Földgázszállító Zrt.

 

 

As part of Nemesbikk compressor station reconstruction, disassembly of six existing gas turbine units (2.8 MW/item) and installation of 4 new gas turbine compressor units (5.4 MW/item) including the building of supporting technologies.

 

 

2007

 

 

MOL Földgázszállító Zrt.

 

 

Renewal of three General Electric FRAME-3 power turbines after 70,000 operating hours at Beregdaróc compressor station

 

 

2007

 

 

MOL Földgázszállító Zrt.

 

 

As part of Mosonmagyaróvár compressor station revamping installation of one new gas turbine driven compressor unit (5.4 MW) including disassembly and building work needed for installation, building of connections for supporting technologies and control engineering systems, including integration into these systems.

 

 

2007

 

 

Babcock- Hitachi Ltd.

 

 

Installation of 25 MW gas turbine (Hitachi H25) at Nyíregyháza combined cycle power plant, participation in commissioning and connecting of instrumentation of the power plant.

 

 

2006

 

 

MOL Földgázszállító Zrt.

 

 

Replacing oil seal gas system with dry seal system on 4 pipeline compressors (Nuovo Pignone PLC 802) at Beregdaróc compressor station, including the supporting equipment of the seal gas system.

 

 

2006

 

 

MOL Földgázszállító Rt.

 

 

Installation of one transport gas pipeline compressor unit, type Solar C402 driven by one SOLAR Taurus 60 gas turbine, its technological, electrical and process control assembly including all building work.

 

 

2006

 

 

EETEK Zrt.

 

 

Energetics reconstruction of Győr site of Rába, boiler revamp, heat exchanger installation and building new hot water system. Wartsila 18V220SG: electric power: 2x3.2 MW 1x2.3 MW;

 

 

2004

 

 

MOL Földgázszállító Rt.

 

 

Implementation of general engineering reconstruction of MOL Rt. Beregdaróc compressor station as general contractor (replacing DN700 connecting pipe, replacing BKG 20000 boiler).

 

 

2004

 

 

Transelektro Rt.

 

 

TVK Power Plant Project: TVK PP gas supply system implementation

 

 

2003

 

 

MOL Rt.

 

 

SOLAR Taurus 60 unit relocation from Mosonmagyaróvár compressor station to Nemesbikk compressor station.

 

 

2003

 

 

Gázmotor Kft.

 

 

BAG 1600 D gas engine 1358 kWe electric power block power plant installation on the site of Tradeplast Kft. in Kunszentmárton.

 

 

2002

 

 

MOL Rt. Beszerzés - Beruházás

 

 

Beregdaróc compressor station reconstruction, technological engineering pipe assembly

 

 

2002

 

 

Sinesco Kft.

 

 

Installation of small power plant (1.5 MW, gas engine drive) at the Mályi Brick Factory.

 

 

2001

 

 

MOL Rt. Beszerzés - Beruházás

 

 

Városföld compressor station, four compressor revamps (two IR2 CDP416 and two SOLAR2 C304)

 

 

2001

 

 

MOL Rt. Beszerzés - Beruházás

 

 

Design, assembly and commissioning of MOL Rt. Hajdúszoboszló compressor station (installation and commissioning of SOLAR TAURUS 60 units)

 

 

2000

 

 

MOL Rt. Beszerzés - Beruházás

 

 

Design, assembly and commissioning of MOL Rt. Mosonmagyaróvár compressor station (installation and commissioning of SOLAR TAURUS 60 units)

 

 

2000

 

 

MOL Rt. Társ. Szolg. Beruházás

 

 

On-site engineering, electric and process control assembly works of gas compressor unit driven by gas turbine SOLAR TAURUS 70 to be set up at Algyő plant, commissioning of unit, test run execution (MOL Rt. Algyő gas plant 150,000 nm3/h gas processing)

 

 

1999

 

 

MOL Rt. Társ. Szolg. Beruházás

 

 

Algyő FMR D-E plant reconstruction, installation of compressor unit driven by Atlas Copco Rotoflow Turboexpander to be based on LTEX technology

 

 

1999

 

 

MOL Rt. BFL Logisztika

 

 

MOL Rt. Fényeslitke pump station, revamp of pipeline centrifugal pumps.

 

 

1999